Interoperability

Designed as standards native.

The Edge was built with capabilities to map proprietary device communications onto standard, grid-friendly protocols, without mandatory proprietary layers in between. We plan to continually add mappings as nascent grid standards coalesce.

Talk compliance

Protocol status

Current protocol matrix

Modbus and serial device mappings work on the Edge today. Grid open standards below are early-stage, with feasibility testing done and device-side mappings landing as pilot devices reach the field. We commit to at least one open standard natively on each device.

StandardScope of standardVersionStatus
Modbus RTULocal device and meter integrationn/aLive
OCPPEV charge-point communication2.1Feasibility
OpenADRDemand response & DER management3.1Feasibility
MatterSmart-device interoperability1.4Feasibility
TEIATrusted energy security1.0Feasibility
MercuryConsumer energy device requirementsn/aConcept
EEBusBuilding energy device interoperabilityn/aRoadmap

Status as of September 2026.

Built for where global regulations are heading.

Global policy is moving toward smart, interoperable energy devices that are secure by design.

  • In the UK, the DESNZ / Elexon Smart Secure Electricity Systems programme expects load control licence applications from late 2026, with the licence in force by the end of 2027.
  • PAS 1878:2026, published in April 2026, tightens the requirements for energy smart appliances, including a dedicated cyber security clause.
  • The Clean Power 2030 Action Plan puts the clean flexible capacity the grid could need by 2030 at up to 66 GW, against 24 GW in 2023.

Direction of travel is clear and WattStack is actively leading in many of these regulatory and standards groups.

Integrate against open standards.

Talk to us about interoperability, whether you build devices or integrate them.

Got a Powered by WattStack device? →